Project Mandate

page · 2026-09-28T21:37:35Z · from wiki page 874

Part of Workstream: evidence recovery. Project Mandate (originally wiki page 874) was copied unchanged on 19 October 2026; this site stands alone, so evidence references are given as plain IDs (e.g. EV-0249). All PRINCE2 pages →
Page ID: 874 · Title: Project Mandate · Evidence status: Not yet labelled — see the Editing Protocol · Version: 1.1.0 · Editing Protocol

About this page type → Read the Docs#prince2-mandate

Project Mandate — later instructions — current baseline, 19 Oct 2026

Current baseline, 19 Oct 2026 (PM File v0.1). Where earlier sections on this page differ, this one governs; they are kept as history.

Instructions from the Executive since the Mandate, 18–19 Oct 2026 (BST). Each changes the baseline through Change Control.

DateInstruction (Sion Buckler)CR
18 Oct 15:156-hourly research updates after every cycleCH-007
18 Oct 16:41Scope: the whole Cedwyn EstateCH-004
18 Oct 23:40Free admin first: no spending, no archive visits until all FOIs/SARs/complaints are filed and answered; 1–2 requests per body per dayCH-012
19 Oct 00:46One email per recipient body; no cc/bccCH-013
19 Oct 20:13Tab decides what to send and when; final check of each draft; no embarrassment or liability; HubSpot kept updated; run as a flywheelCH-014
19 Oct 20:14 / 20:26Check the inbox before each send; read each recipient’s attachments before replyingCH-014
19 Oct 21:59Debrief flywheel SOP (all surfaces, Cloudflare redeploys); PRINCE2 update; PM File e-bookCH-015, CH-016
FieldEntry
ProjectGreat House Farm / Tŷ Mawr — Evidence Recovery
Mandate date16 October 2026
Issued byExecutor of Mary (Nancy) Williams’s estate (the client). Identity: TBC — Sion to confirm
Received byProject Manager (roles)
Next productProject Brief

The need

I want all surviving evidence relating to Great House Farm / Tŷ Mawr recovered.

What I want

  • Every available route for obtaining records and artefacts exhausted.
  • Anything that cannot be obtained positively ruled out as destroyed, missing, classified, or lost forever.
  • If evidence of fraud, concealment, or government involvement is discovered that meets the threshold to reopen a case or report it, that triggers a separate project running in parallel.

What I do not want in this document

How the work will be done. That belongs to the Project Brief. The detailed schedule belongs to the Project Plan.

Later instructions (change control)

Date (BST)InstructionRecord
18 Oct 16:41Widen research to the whole Cedwyn Estate (~40 parcels)CH-004
18 Oct 16:47Evidence-first wiki architectureCH-005
18 Oct 19:02PRINCE2 layer rebuiltCH-008

Page version & change log

Current version: 1.1.0

VersionDate (UTC)Editor (human or agent name)ChangeSource / evidence
1.0.02026-10-18T15:19ZTab (for Sion Buckler)Footer standardised; no content changeEditing Protocol, 18 Oct 2026
1.1.02026-10-19T21:09ZTab (for Sion Buckler)Added current baseline section (19 Oct 2026): Added 18–19 Oct Executive instructions table; earlier content keptSion Buckler, 21:59 BST 19 Oct 2026 (PRINCE2 update and PM File); sources: send-readiness list, 19 Oct WG letters, research cycle 14, task ledger

Agents and editors: follow the Editing Protocol.