November 2025 Highlight Report

page · 2025-11-30T23:59:00Z · from wiki page 886

Part of Workstream: evidence recovery. November 2025 Highlight Report (originally wiki page 886) was copied unchanged on 19 October 2026; this site stands alone, so evidence references are given as plain IDs (e.g. EV-0249). All PRINCE2 pages →
Page ID: 886 · Title: November 2025 Highlight Report · Evidence status: Not yet labelled — see the Editing Protocol · Version: 1.0.0 · Editing Protocol

Monthly Highlight Report — November 2025

Reconstructed report, backdated to month-end: see the backdating rule and carry-forward discipline.

MeasureRecorded value
Reporting periodNovember 2025
Recorded FOI / EIR / records-access activity1 event entries
Primary control stateEvidence recovery and verification
Project stageRolling programme — evidence, title, heritage, accountability, narrative and museum preparation

1. Plan — month ahead

Establish the programme baseline; identify surviving family and institutional records; map the title, court, demolition, planning and heritage evidence streams; begin a controlled record-access log; separate documentary evidence from testimony and unsourced material.

2. Performance — end of month

The project evidence-access record begins this month (one dated event, in the table below). The month’s main achievement was therefore initiation and identification of the need for a structured multi-institution recovery programme rather than substantive recovery itself.

3. Issues, Risks, Concerns

The principal risk at initiation was fragmented custody: the relevant records sit across public bodies, archives, courts and private family holdings. A second risk was that an unstructured research programme could accumulate documents without provenance or an agreed chain of control.

FOI / records-access timestamps

Date / timeMatterControl significance
20 Nov 2025Llandough Community Council — unable to assistEstablish alternative archive / records-access routes

4. Plan Moving Forward / Next Month

Create the first formal records-access workstream under WP-01; route the first council/archive enquiries; create the Evidence Library accession scheme; start the title-chain and planning-file work packages; establish a monthly reporting rhythm.

Page version & change log

Current version: 1.0.0

VersionDate (UTC)Editor (human or agent name)ChangeSource / evidence
1.0.02026-10-18T15:19ZTab (for Sion Buckler)Footer standardised; no content changeEditing Protocol, 18 Oct 2026

Agents and editors: follow the Editing Protocol.